| Early constructions | ||
![]() |
||
| Stair fill 1992 Grundy warehouse (demolished) west London | ||
![]() |
||
| Clipped cone 1992 | ||
| Materials: wood | ||
| Built at: Grey court school, Richmond, Surrey UK | ||
| Weight: 1 kg | ||
| Dimensions: 300mm x 80mm x 80mm |
![]() |
||
| Our first sound system 1994 (Chris furling on top of stack) | ||
![]() |
||
| Another speaker stack (Chris Ivey on top of soeakers 1995 | ||
![]() |
||
| Close up of speaker stack | ||
![]() |
||
| Sound system built into floor 1996 Chelsea school of Art |